Chapter 3 cladding.
Steel stud ceiling framing details.
Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards.
These products should not be used in design or construction without an independent evaluation by a qualified engineer or architect to verify the suitability.
Call 509 343 9019 for dwg files.
Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications.
Studs and joists must be in true alignment.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud.
Ssma standard cad details.
Framing practices and procedures for wood and steel framing.
The details contained in this document are intended as a general guide for using steel stud manufacturers association ssma member products.
G1 schematic of typical steel framed house g2 c shape configuration g3 track configuration g4 joist web holes g5 stud web holes g6 joist web hole patch g7 stud web hole patch 1 g8 in line framing detail g9 web stiffener detail 1 g10 web stiffener detail 2 g11 web stiffener detail 3 g12 track splice detail.
All framing lumber should be the correct grade for the intended use and 38 mm x 89 mm nominal 2 x 4 or larger should bear the grade.
For low clearance areas they also come in 1 5 8 inch widths.
The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level.
Steel studs are beneficial for building ceilings because they are straight light and can be purchased in longer lengths than wood studs.
We are aggressively working on updating the hundreds of cold formed framing details located in the cad library with updated product information.
Contact clarkdietrich technical services at 888 437 3244 for any questions on these details or if you.
Bridging fire stops soil pipes etc must not protrude beyond framing.
In many applications installing a steel stud ceiling take less time and effort than it would with wood studs.
Includes details for resilient channel installation chase walls furred ceilings and walls and door and window openings.
2 1 2 250s 3 1 2 350s 3 5 8 362s 4 400s 5 1 2 550s 6 600s 8 800s 10.
Updated clarkdietrich building system cad details can be found in the new clarkdietrich s itools cad library.
The metal stud ceiling frame is completed after about 3 hours of continuous work.